Homepage

Homepage

New Developments

New Developments

Buildings

Buildings

Blog

Blog

TV

TV

Forum

Forum

Listings

Listings

Companies

Companies

Database of New Property Developments in London UK
Join Today

View to the building site from Manresa Road

January 15, 2012

January 15, 2012

January 15, 2012

Considerate Constructions

January 15, 2012

Construction site in the Summer

June 20, 2011

Henry Moore Court

Address: Henry Moore Court, Manresa Road, London SW3 6LS
Type: Residential
Completion: Autumn 2012
Flats: 15
Website: www.henrymoorecourt.co.uk
Viewed: 1073 times

Description

Henry Moore Court is now under construction in the heart of Chelsea - London's finest village. The scheme comprises 15 exclusive apartments and two self-contained town houses, all served by private basement car parking with gymnasium facilities and a 24/7 security reception service.

This new residential development is being built on the site of the former Chelsea College of Art in Manresa Road, within the Royal Borough of Kensington and Chelsea.

The College was located in Chelsea for some 50 years before its recent relocation to a site adjacent to the Tate Britain Gallery. The name of the scheme is taken from the Head of the Department of Sculpture from 1932 - Henry Moore OM CH FBA.

Common Services

- 24 hour manned security reception
- 12 hour porter services
- 24 hour CCTV security monitoring
- Double height reception area - Spanish origin polished Azul Naif marble,
European oak hardwood floors, bespoke solid timber reception desk
and French origin Noir Saint Laurent worktop, and feature slot fireplace
- High security below ground car park
- Individual below ground storage rooms
- Fully equipped gym/event room
- Environmental cooling to lobbies
- Two lift cores accessing all floors

Henry Moore Court is being developed by a joint venture company owned by The Athos Group and The Carlyle Group. The development advisors are Alpark Ltd who have successfully advised upon many residential and commercial schemes in the UK. Henry Moore Court is proposed to be complete for occupation in Autumn 2012.

Prices: £5-14m.

Source: henrymoorecourt.co.uk

Companies

Developer
Sales

Buildington Rating & Notes

arendusprojektid
2360
Location
1
Architecture
Condition
Plans
Transport
Environment
1

0.861

Development added by: Buildington
Published: 20. June 2011
2
kohv__devprjs_comments http://www.buildington.co.uk/new_developments/london_sw3/manresa_road/henry_moore_court/id/2360 http://www.buildington.co.uk/new developments/toggle comment visibility http://www.buildington.co.uk/new developments/ban comment ip project_id = 2360 15 1 comment_block
loading..

Write comment:

Name:
Captcha
© 2012 Buildington Advertising AgentsAbout UsPrivacyTermsFAQSite Index  Contact Us Follow us

All form fields are required.

loading..