Newham's Yard

Bermondsey SE1
C3E
Mixed use building

Key Details

Address
151-153 Tower Bridge Road, London SE1 3JE
Local Area
Bermondsey
County
Greater London
Country
England
Status
Completed
Completion
2021
Buildings
2
Accommodation
143
Flats
86
Use Classes
C3, E

Overview

Newham's Yard on Tower Bridge Road is a residential-led development by Galliard and Acorn Property Group in Bermondsey, London SE1. Completed in 2021.

A collection of studios, 1, 2 and 3-bedroom apartments were for sale across two buildings. Select apartments feature private outdoor space be it in the form of a balcony or terrace.

Amenities
New office/retail/gym space and an exciting new public realm to the Bermondsey area which connects to Bermondsey street, St Mary Magdalen Churchyard, Tanner Park and Tower Bridge Road.

Newham's Yard South 151 Tower Bridge Road
The building comprises 57 apartments and completed in Q2 2021.
1, 2 & 3 bedroom apartments arranged from on 9 levels. Landscaped communal roof garden at the 7th-floor level.

Newham's Yard North 153 Tower Bridge Road
The building comprises 29 studios, 1, 2 and 2/3 bedroom apartments arranged on floors 2-7. Completed in Q2 2020.

Commercial Space
The commercial space comprises seven units, totalling 18,186 sq ft. All have flexible use and allow for either office, retail, or food and beverage use.

History

Before the redevelopment started, the site comprised three existing buildings - 151 Tower Bridge Road (2004), 153-155 Tower Bridge Road (2004) and 157 Tower Bridge Road (not completed, construction stalled in 2010).

2018 October - Acorn Property Group submits a new planning application for change of use from 106 residential units (40 x studios, 36 x 1bed and 30 x 2bed), 41 aparthotel units/partially vacant aparthotel floorspace and flexible retail/commercial floorspace to 86 residential units (4 x studio, 30 x 1-bed, 45 x 2-bed and 7 x 3-bed), 143 aparthotel units, a new gym (D2), a cafe (A3) and flexible retail/commercial floorspace (A1, A2, A3, B1a); Southwark Council ref.no. 18/AP/3167.

2018 August - SACO acquires the development from First Base and plans to complete it by Spring 2020. The planned development comprised apartments, a short stay hotel and commercial units.

2017 April - The site has the resolution to grant planning permission. Ref no 16/AP/3222 by London Borough of Southwark. Developer: Starwood Capital Group and First Base, Architect: Arney Fender Katsalidis.

References:
1. Southwark Council planning.southwark.gov.uk

#launchingsoon - subscribe to our weekly newsletter
Be the first to hear about the upcoming launch events and emerging projects – Buildington’s free ‘Launch Events Weekly’ newsletter is sent out once a week

Site & Location

The site is 650 metres from Tower Bridge adjacent to the Grade II* listed Mary Magdalen Church and gardens. Newham’s Yard offers residents direct pedestrian access to Bermondsey Street to enjoy artisan cafes, bars and independent shops, with the iconic street markets of Bermondsey Market and Maltby Street Market on the doorstep. A 10-minute walk from London Bridge Station in Zone 1.

Transport

NATIONAL-RAIL
London Bridge Rail StationSoutheastern, Southern, Thameslink
BUS
Abbey Street - 1 min. walking / 25 metres188, 42, 78

Team

Company
Type
Year
Architect
Developer
DP9
Planning Consultant
Transport Consultant
Serviced Apartments
Heritage Consultant
Office Leasing
Office Leasing

Timeline

News, events, milestones and offers from the new development
+ Post a new milestone

News from the companies

Nearby new developments

Bermondsey Yards
Aviva Investors has committed to over £100 million into London’s Southbank, acquiring two adjacent commercial development sites on Bermondsey Street, which it will...
21.01.2021
Print Makers
 
Show home launch
Show apartment launch at Print Makers in Bermondsey, London SE1, on Saturday 11th May 2024.Nine two and three-bedroom apartments, with private balconies and exceptional...
24.04.2024
Residential prices from
£980,000
Completion
2024
11-13 Spa Road
 
New appointment
Graham has been appointed to build the new £13 million student accommodation block at 11-13 Spa Road in Bermondsey Spa Gardens. The 185-room building designed by...
18.06.2021
Completion
2022
TBC.London
 
New images
New photos of TBC.London office development by Fore next to Tower Bridge in London SE1.90,000 sq ft of office space overlooking the River Thames and Tower Bridge...
22.04.2024
Completion
2024
EDGE London Bridge
 
New appointment
Developer Edge, in partnership with Goldman Sachs Asset Management and their funding partners, LPPI and the London Fund, has appointed Mace as the main contractor to...
08.10.2022
Completion
2026
Chapter London Bridge
 
Foundation works start
Works have started on the new purpose-built student accommodation Chapter London Bridge. With groundworks underway, the main construction work is due to start in March...
02.02.2022
Completion
2025

Disclaimer

Information on this page is for guidance only and remains subject to change. Buildington does not sell or let this property. For more information about this property please register your interest on the original website or get in touch with the Connected Companies.