Buildington
Open database of new property developments & buildings in London, UK.
CGI of the 32-storey tower at Manor Road Quarter designed by EPR Architects.

CGI of the 32-storey tower at Manor Road Quarter designed by EPR Architects.

23.12.2018 newham.gov.uk

Manor Road Quarter

Address:
300 Manor Road, London E16 4PA
Type:
Mixed use
Flats:
804
Viewed:
1005

Description of Manor Road Quarter

Manor Road Quarter is a new development planned for the Manor Road Retail Park and the former HSS Hire shop sites in Canning Town.

The first phase of the development will provide 804 new homes, of which 402 (50%) will be much-needed affordable homes in the borough.

Flexible commercial space on the ground floor.

A new linear park will be created with significant highways upgrades.

Manor Road Quarter on ca. 4.72 acres (1.91 ha) is made up of two sites, straddling the southern end of Manor Road, just north of the A13 and a short walk from Canning Town station.

Manor Road Retail Park
This site makes up the majority of the proposals and was formerly owned by the Greater London Authority (GLA). The former MFI unit at the Manor Road Retail Park is currently
vacant, although it is occasionally used for ‘pop-up’ events. The remaining units are currently occupied by Carpet Right and Wickes superstores. The site also includes a large surface car park. Manor Road Retail Park is bounded to the west by the Stratford - Canning Town DLR and tube line and by the A13 (Newham Way) to the south.

Former HSS Hire shop site
The HSS Hire shop site, which is owned by the English Cities Fund, is to the east of Manor Road, at the junction with Barking Road. The buildings on this site have already been demolished.

Timeline

2018 - Planning application submitted to Newham Council. 18/03506/OUT for the redevelopment of land bounded by Manor Road. Outline planning permission for up to 449 dwellings (Class C3), up to 1,845m2 of commercial (Class B1) and retail (Class A1/A2/A3/A4) floorspace; car parking, open space and associated infrastructure works; full planning permission for Phase 1 for 355 dwellings (Class C3), 555m2 of commercial (Class B1) and retail (Class A1/A2/A3/A4) floorspace; car parking, open space and associated infrastructure works. Planning Consultant: Longboard Consulting.

Spring / Summer 2019 - Phase 1 start on site. Manor Road Retail Park phase 1 (former MFI unit).

Autumn 2021 - Phase 2 start on site. Manor Road Retail Park phase 2 (Wickes and Carpet Right units and car park).

Summer 2023 - Phase 3 start on site. Former HSS Hire shop site.

Connected Companies

Developer:
Architect:

News: (0)

*DISCLAIMER! Information on this page is for guidance only and remains subject to change. Buildington does not sell or let this property. For more information about this property please register your interest on the original website or get in touch with the Connected Companies.

New London developments on Buildington - monthly update

New Developments