The Arc development under construction in spring 2021. The hoarding on City Road, London EC1. The Link building in the background.

The Arc development under construction in spring 2021. The hoarding on City Road, London EC1. The Link building in the background.

11.04.2021
The Arc team on the hoarding of the development - A development by Ghelamco, residential agents JLL and Knight Frank. Office enquiries CBRE and Savills. Designed by Allford Hall Monaghan Morris.

The Arc team on the hoarding of the development - A development by Ghelamco, residential agents JLL and Knight Frank. Office enquiries CBRE and Savills. Designed by Allford Hall Monaghan Morris.

11.04.2021
The Arc development hoarding on City Road reads:

The Arc development hoarding on City Road reads: "100 residences, office and retail space, restaurants. Marketing Suite opposite."

11.04.2021
Developer Ghelamco's flags at The Arc development site on City Road in London EC1.

Developer Ghelamco's flags at The Arc development site on City Road in London EC1.

11.04.2021
Screen capture of the proposed building CGI

Screen capture of the proposed building CGI

Source: Hackney.gov.uk Design and Access Statement by AHMM

The Arc

Address:
225 City Road, London EC1V 1JT
Area:
Shoreditch
Local Authority:
Hackney
Type:
Mixed use
Completion:
2022
Flats:
100
Offices:
1
Retails:
3
Prices from:
£728,000
Viewed:
10675

Description of The Arc

The Arc at 225 City Road is a residential development in Shoreditch, London EC1.

The 22-storey tower designed by AHMM comprises new apartments and 150,000 sq ft of office and retail space near the Old Street roundabout.

New Homes: 100 new studios, 1, 2 and 3-bedroom homes for sale. Sizes range from 441 to 1,733 sq ft. The homes are leasehold. Expected completion Q4 2022.

Amenities

The residents at The Arc building will benefit from:
- Rooftop terrace on 7th floor
- Cinema
- Communal lounge
- Yoga room
- Gym fully fitted
- Fitness suite
- Golf-simulation room
- Seating area at the front
- Cycle hub on the lower ground floor
- 332 cycle parking spaces

Event spaces managed by a management team and will be bookable through a dedicated app.

New Offices & Retail Space: 150,000 sq ft of flexible office space across seven floors is available through Savills and CBRE.

The scheme will have BREEAM Excellent, WELL Gold & DNGB sustainability certifications.

Independent restaurant and handpicked retailers on the ground floor.

A 1-acre site on the borders of Islington and Barbican.

History

2017 June - Consent received for a 22-storey mixed-use scheme with 100 rental flats and 146,000 sq ft of offices.

2016 June - Planning application submitted for:
Erection of part 22 storey, part 7 storey over basement building comprising fitness centre use at basement level (D2), flexible retail uses at ground floor level (A1/A3/A4), office use at the ground to sixth-floor level (B1) and 100 Private Rented Sector residential units on the upper floors (C3); provision of communal terrace and gardens at sixth and seventh-floor level; provision of ancillary services and residential facilities and plant, cycle parking and associated works. Hackney Council ref no 2016/1814.

Neighbouring Buildings

The Link to west
Wenlock Works to north
Shoreditch Police Station east across Shepherdess Walk
The Eagle pub east across Shepherdess Walk
Eagle Dwellings south across the City Road

Connected Companies

Interior Designer:
Developer:
Main Contractor:
Commercial Leasing:
Commercial Leasing:
Sales:
Sales:

Transport

The nearest tube, train and bus stations.
Old Street Rail Station
Great-northern
Moorfields Eye Hospital
205, 214, 43, N205

News: (5)

Exclusive pre-sales launch

Exclusive pre-sales launch takes place this Thursday 25th February 2021.

The Arc offers 100 spacious apartments are for sale.

Residents benefit from a landscaped roof terrace, yoga studio, golf simulation and cinema room.

Visit the development website to register your interest.

23/02/2021 18:43 by Buildington
Now launched!

The Arc on City Road has now launched!

Studios, 1, 2 and 3-bedroom homes for sale.

Commercial premises to let through CBRE and Savills.

Check out the new website for floorplans and other details at thearc-london.com.

21/01/2021 12:53 by Buildington
Launching Soon

The Arc is launching on the 21st of January 2020!

100 new 1, 2 and 3-bedroom homes, a wide range of amenities and select retailers.

Register your interest on the development website today.

27/11/2020 19:12 by Buildington

Hackney Council has decided to grant planning permission for 225 City Road, reports architect AHMM.

The mixed-use development comprises commercial workspace and 100 private rented sector homes. These will be supported by new retail, café and restaurant uses from a shared super lobby on the ground floor and complemented by public realm improvements around the building and along City Road.

Via AHMM www.ahmm.co.uk 23.03.2017

28/03/2017 08:10 by Buildington

225 City Road mixed-use development in London EC1 - new on Buildington!

20/12/2016 00:13 by Buildington

*DISCLAIMER! Information on this page is for guidance only and remains subject to change. Buildington does not sell or let this property. For more information about this property please register your interest on the original website or get in touch with the Connected Companies.

New London developments on Buildington - monthly update