Outernet London

Midtown WC2H
C1ESG
Mixed use building

Key Details

Address
Denmark Street, London WC2H
Local Area
Midtown
Local Authority
Camden
County
Greater London
Country
England
Completion
2022
Use Classes
C1, E, SG
Website

Overview

Outernet London is a mixed-use development in London WC2.

The project comprises retail, leisure and entertainment spaces, commercial offices and residential accommodation across 4 new buildings and a number of existing buildings.

The Now Building
The largest of the new buildings incorporates an innovative, retractable façade on its middle floors, revealing an urban gallery that is open to the public at street level. The building’s foundations straddle the Crossrail tunnel, above which is an underground ‘box within a box’ to contain an auditorium. Another of the new buildings incorporates a Victorian retained façade.

The new buildings meet BREEAM (2011) Very Good target. The domestic refurbishments are designed to meet BREEAM (2012) Excellent.

Buildings before the redevelopment
138-148 (even) Charing Cross Road;
4, 6, 7, 9, 10 and 20-28 Denmark Street;
1-6 and 16-23 Denmark Place;
52-59 St Giles High Street;
4 Flitcroft Street;
1 Brook Mews.

Other buildings along the north side of Denmark Street, London’s ‘Tin Pan Alley’ are restored.

The refurbishment covers a number of Grade II listed buildings on Denmark Street, Denmark Place and St Giles High Street, some dating back to before the Great Fire of London in 1666.

The many independent music shops on this side of the street have been updated, with offices and residential accommodation on the upper levels.

2021 summer - Chateau Denmark launch.

Planning Application
Redevelopment involving the erection of three buildings (5 and 7 storey buildings facing Centre Point Tower and a 4 storey building on Denmark Place), following the demolition of 1-6, 17-21 Denmark Place and the demolition of York and Clifton Mansions behind a retained facade to provide 2955sqm GIA of basement Event Gallery space to be used for community events, exhibitions, product launches, live music, awards ceremonies, conferences and fashion shows (Sui Generis); a 723sqm GIA urban gallery with 1912sqm of internal LED screens to be used for circulation space, retail, advertising, exhibitions, brand and product launches, corporate events, screenings, exhibitions and events (Sui Generis); 420sqm GIA of flexible retails and restaurant floorspace (Class A1/A3); 2995sqm GIA of restaurant floorspace (Class A3); 1066sqm GIA of drinking establishment (Class A4) and a 28 bedroom hotel (Class C1) between Denmark Place and Andrew Borde Street. Change of use of 4, 6, 7, 9, 10, 20-28 Denmark Street, 4 Flitcroft Street and 1 Book Mews to provide 1551sqm GIA of office floor space (Class B1a); 2553sqm GIA of residential floor space (Class C3); 242sqm GIA of affordable housing (Class C3) and 2023sqm GIA of retail floor space (Class A1). Provision of a new pedestrian route from Andrew Borde Street to Denmark Street at ground floor level and associated partial demolition at 21 Denmark Street. Camden ref. no. 2015/3073/P.

History

The street was once home to ‘The NME’ and ‘Melody Maker’, as well as recording studios that saw The Kinks, the Rolling Stones and Elton John pass through their doors.

A 300-year-old structure behind Denmark Street that has been a stable yard and a blacksmith in its time, and was most recently part of the famous 12 Bar Club music venue, is placed on a concrete raft and moved temporarily within the site, before being returned to its original location to become part of the entrance to the underground auditorium.

Construction work started in July 2017 and was completed in February 2021.

2017 July - Skanska announces it has signed a £142 million contract to build St Giles Circus development for developer Consolidated Developments.

Also known as St Giles Circus.

References
1. London Borough of Camden camden.gov.uk

#launchingsoon - subscribe to our weekly newsletter
Be the first to hear about the upcoming launch events and emerging projects – Buildington’s free ‘Launch Events Weekly’ newsletter is sent out once a week

Site & Location

Transport

TUBE
Tottenham Court Road Underground StationCentral, Northern
BUS
Tottenham Court Road Station14, 176, 19, 38, N19, N38, N41, 1, N1, N171, 55, 98, N207, N25, N55, N8, N98

Team

Company
Type
Year
Main Contractor
Architect
Developer
Structural Engineer
Interior Designer
Office Leasing

Timeline

News, events, milestones and offers from the new development
+ Post a new milestone

News from the companies

Nearby new developments

121-125 Charing Cross Road
 
Planning application submitted
Planning application submitted for demolition of existing roof form, insertion of a facsimile floor to match lower floors and creation of a new fourth floor at 121-123...
12.12.2021
16-19 Soho Square
 
Design
GPE is refining plans of the existing planning consent that will deliver around 91,000 sq ft of new Grade A office and prime retail space at Soho Square.
23.01.2024
The Earnshaw
 
Topped out
Main contractor Skanska reached the highest point of construction at The Earnshaw. The development comprises two separate buildings – an 11-storey, 231,000 sqft...
30.05.2022
Completion
2023
12-13 Greek Street
 
Completion
Practical completion for the affordable apartments at 12-13 Greek Street within Ilona Rose House was achieved at the beginning of this month, reports development manager...
27.04.2022
Completion
2022

Disclaimer

Information on this page is for guidance only and remains subject to change. Buildington does not sell or let this property. For more information about this property please register your interest on the original website or get in touch with the Connected Companies.