The Stage
Key Details
Overview
The Stage is a 540,000 sq ft mixed-use development in Shoreditch, London EC2.
The project consists of a new 37-storey residential tower and theatre, as well as two office buildings providing 25,000m2, ca 4,500m2 of shops and restaurants on a 2.5-acre site in Shoreditch, East London.
Apartments For Sale: The 37-storey tower contains 412 studios, 1, 2 and 3-bedroom apartments. Duplex penthouse apartments at levels 36-37. Register your interest here.
The Curtain Theatre: The scheme's centrepiece will be a showcase of London's second oldest Shakespearean playhouse, the 16th Century Curtain Theatre - where Shakespeare's Romeo and Juliet and Henry V were first performed. The remains of the Curtain Theatre dating back to 1577 were discovered some three metres below the surface of the development. The theatre and related finds were excavated, preserved and exhibited including a 164-seat indoor auditorium. An additional 200-seat performance space will be built outside and linked to a square lined with shops, bars, and restaurants.
Buildings
- The Stage - 37-storey apartment tower
- The Hewett office building 75,000 sq ft occupied by WeWork
- The Bard office building 140,000 sq ft (70% pre-let)
- Museum of Shakespeare - visitor attraction
- The Pavillion bar and restaurant - two F&B units
- The Viaduct Building - retail units
Amenities
The amenities will include a 24-hour concierge, access to a games/recreational lounge, and a lavish 20-seat screening room offering the most fashionable of movie nights.
A 32nd-level sky bar and terrace.
The Stage in numbers
540,000 sq ft of overall scheme
388,426 sq ft of residential space
238,538 sq ft of office space
47,900 sq ft of public realm
33,668 sq ft of retail space
16,500 of recreational space
15,715 of heritage space
412 apartments
37 floor levels
4 principal apartment styles
3 superlative duplex penthouses
Office Buildings: The two office buildings bookend the three retained historic buildings and face a conservation area on the opposite side of Curtain Road. The office and retail elements of the development have been designed to achieve a Breeam ‘Excellent' standard and residential units will achieve Code for Sustainable Homes level four.
History
Launched 17th March 2016.
2015 - Vanke joins the Stage consortium with partners Cain International, Galliard Homes and McCourt Global Investors.
Inside The Stage development
Discover amenities, unit types and property for sale & for rent
Get exclusive The Stage updates on your email
Site & Location
5 minutes walk from Liverpool Street providing 7 tube, rail and overground services.
Team
News from the companies
Nearby new developments
Disclaimer
Information on this page is for guidance only and remains subject to change. Buildington does not sell or let this property. For more information about this property please register your interest on the original website or get in touch with the Connected Companies.