White Collar Factory EC1V Timeline News and progress updates from White Collar Factory new development in EC1V Post a new milestone White Collar Factory has been shortlisted for RIBA London Awards 2018. All shortlisted buildings will now be assessed by a regional jury with the winning buildings... 27/03/2018 by Buildington Derwent London has officially opened the White Collar Factory. Located overlooking Old Street Roundabout, at the heart of London’s Tech Belt, and designed by... 06/09/2017 by Buildington White Collar Factory is currently 87% let overall with office tower 92% let. Source: Interim Results 2017, Derwent London Plc. 10.8.2017 11/08/2017 by Buildington Last opportunity to become a part of this iconic building - 6,732 sq ft available on the 12th floor. Join an exciting array of tenants including: Adobe, AKTII, BGL,... 19/07/2017 by Buildington The top two floors of the tower at White Collar Factory have been let to Box.com, the cloud content management company, reports Derwent London. The initial rent is... 02/06/2017 by Buildington The completed White Collar Factory is currently 72% let with the majority of the remaining space under offer. Source: Derwent London Q1 2017 Business Update 11.05.2017 15/05/2017 by Buildington Derwent London has pre-let the 13th floor at The White Collar Factory to Adobe, who has already taken two other floors in the tower. The new letting comprises 14,900... 28/02/2017 by Buildington Wired Certified Platinum White Collar Factory development has secured the UK’s first Wired Certified Platinum for Development & Redevelopment rating bringing world-class connectivity to Old... 03/06/2016 by Buildington Capital One has signed to take two floors at the White Collar Factory overlooking Silicon Roundabout. The decision was driven by business expansion and the depth of... 13/05/2016 by Buildington BGL financial services group has pre-let 14,300 sq ft on the sixth floor of White Collar Factory. It will be a complementary digital hub for the BGL Group and its... 23/10/2015 by Buildington The Office Group, a leading provider of design-led and flexible offices and co-working spaces, and structural engineers AKT II, are taking 5 floors in the 16-storey... 14/07/2015 by Buildington Demolition finished in August 2014 and the development is due for completion in around 18 months’ time, reports Derwent London in annual results for 2014. White... 27/02/2015 by Buildington White Collar Factory in Old Street, London EC1 - new mixed-use development on Buildington! 27/02/2014 by Buildington