06/07/2018 by Buildington
The concrete structure at One Bishopsgate Plaza has now reached level 11, reports architect MSMR.
The rapid progress is due in part to the pre-cast concrete columns being manufactured off-site and then craned into position on the post-tensioned concrete slab that is cast in situ.
MSMR is the interior architect designing the residential element and delivery architects for the hotel.