The Ray office building on Farringdon Road, London EC1.

The Ray office building on Farringdon Road, London EC1.

March 2019
The Ray

The Ray

March 2019
The Ray

The Ray

March 2019
The Ray

The Ray

March 2019
CGI of 119 Farringdon Road

CGI of 119 Farringdon Road

Image: 119farringdonrd.com

The Ray

Address:
119 Farringdon Road, London EC1R 3DA
Type:
Commercial
Completion:
November 2018
Offices:
1
Viewed:
6407

Description of The Ray

The Ray at 119 Farringdon Street is a 100,000 sq ft office building in London.

Designed by AHMM, 119 Farringdon Road comprises 100,000 sq ft (NIFA) of Grade-A office accommodation and retail space.

History

In 2016 McLaren secured the design and build contract worth £40.8m to deliver a new commercial building for Viridis Real Estate in Central London

The new build is a 9 storey post-tensioned concrete frame clad with precast concrete panels and brick slips bonded to the precast panels. The fit-out is to a CAT A standard to the majority of floor plates with exposed concrete and services. There will be retail and SME space on the ground and lower ground floors. The design includes landscaped terraces for the office accommodation to the west elevation that will enhance the visual landscape of the area.

Built in the 1960s, the existing building, formerly known as The Guardian House, was once home to The Guardian newspaper.

References:
- McLaren Group www.mclarengroup.com

Connected Companies

Main Contractor:
Developer:

News: (3)

New photos!

12/03/2019 13:07 by Buildington

The 119 Farringdon Road development celebrated the Topping Out Ceremony on Thursday, 22 March 2018.

Approximately 50 people were in attendance for the afternoon celebration, including the McLaren site team and representatives from Viridis, AHMM, Gardiner & Theobald and other consultants involved with the project.

The £40.8m commercial development, called ‘The Ray’, will provide 100,000 sq ft of Grade-A office and retail space over nine storeys. The design includes landscaped terraces for the office accommodation to the west elevation that will enhance the visual landscape of the area.

Domonic Egan, Operations Director, McLaren Construction London said:
‘’We are delighted to be Topping Out our second commercial office project for Viridis Real Estate. This milestone achieved today is testament to the hard work of the McLaren team led by Gavin and our excellent working relationship with our customer. ‘The Ray’ is a unique and impressive building, and will be a feature on Farringdon Road for years to come.’’

Gavin Turnbull, Project Director at 119 Farringdon Road commented:
‘’It has been a pleasure to work on this project with Viridis once again, as well as with all the consultants and hard-working McLaren team. A lot of teamwork and diligence has gone into ensuring ‘The Ray’ looks as impressive as it does and this milestone achieved today should be celebrated by everyone involved in this successful project. ‘’

This is the second commercial project for customer Viridis Real Estate after successfully completing 28 Chancery Lane in 2017. Completion date is set for November 2018 with potential tenants moving in early 2019.

Source: Mclaren mclarengroup.com

23/03/2018 15:58 by Buildington

McLaren Construction has secured a design and build contract worth £40.8m to deliver a new commercial building for Viridis Real Estate in London EC1.

David Osborne, Divisional Director, McLaren Construction London said: “It is an absolute privilege to be engaged on a second project with Viridis Real Estate, for their client investor, a true testament to the valued working relationship developed between McLaren and Viridis on the Chancery Lane scheme. Working closely with the Viridis team to deliver this iconic building, designed by AHMM, will be a real pleasure and something that both the McLaren team and me personally are looking forward to.”

This is the second commercial project McLaren Construction has secured with Viridis, on behalf of their client investors, following the 28 Chancery Lane office development which is programmed to complete at the end of the year. The Farringdon Road project started on site in July 2016 and is due to finish Q4 2018.

Source: McLaren

06/09/2016 11:08 by Buildington

*DISCLAIMER! Information on this page is for guidance only and remains subject to change. Buildington does not sell or let this property. For more information about this property please register your interest on the original website or get in touch with the Connected Companies.

New London developments on Buildington - monthly update

Buildings