The Old Vinyl Factory
U+I has secured planning permission for The Powerhouse at the Old Vinyl Factory site, which will bring it back into use as a 29,000 sq ft innovation hub for its Plus X...
01.08.2019
Coppermaker Square
 
Show home launch
The show apartments are now available to view at Coppermaker Square. Brand new rental apartments will be completed in 2023.Starting prices:Studios from...
03.11.2022
Completion
2024
Cecil Avenue
 
New images
Progress update and new photos from Brent Council's Wembley High Road (East of Cecil Avenue) site.
21.03.2024
Belvedere Gardens
 
Award received
The Penthouse at Belvedere Gardens, Southbank Place, was honoured at the Evening Standard Awards, winning the Best Luxury Home Award. The Evening Standard New Homes...
03.10.2022
Completion
2019
Brent Cross Town
The new Brent Cross West station is now open, connecting Brent Cross Town with Central London in as little as 12 minutes.Live beside 50 acres of parks and playing fields...
12.12.2023
Residential prices from
£420,000
Completion
2025
22-42 High Road
 
Planning permission granted
Planning permission granted for the demolition of the existing buildings and redevelopment to provide part 3-8 storey buildings providing mixed-use development,...
27.12.2021
Revolution
Revolution by CEG is a 170,000 sq ft Grade A office development in Ealing, London W5.
28.09.2019
North Brent School
 
Demolition start
Chancel House office building demolition on Neasden Lane is now underway. The building will be replaced by North Brent School, a DfE funded secondary school for 1,150...
18.09.2021
Completion
2023
Morden Wharf
 
Plans approved by Committee
The Royal Borough Greenwich’s Planning Committee has resolved to grant planning consent the OMA (Office for Metropolitan Architecture) designed Morden Wharf. The...
09.09.2021
60-62 Walton Street
New on Buildington - The former police building at 60-62 Walton Street will be converted into 7 flats in Chelsea, London SW3.
16.10.2019
Southwark Over Station Development
Helical and TfL are looking at alternative approaches to the site at Southwark OSD as the feasibility studies are underway.Located above Southwark Station, the scheme...
24.11.2023
58-70 Old Compton Street
 
Planning application submitted
Planning application submitted for the development at 58-70 Old Compton Street in Soho, London W1.
09.04.2024
The BeCa
 
Sales Launch
As New York's sultry influence reaches the heart of Old Kent Road, London's skyline prepares to welcome an exciting new £130 million architectural marvel –...
19.06.2023
Residential prices from
£440,000
Completion
2024
593-613 Old Kent Road
Southwark Council has appointed a team of three architectural practices who will design plans to transform the Currys PC World site at 593-613 Old Kent Road In London...
09.03.2021
Grange Farm Estate
Higgins has been awarded a £22.5 million contract to design and build the first phase of the Grange Farm Estate in South Harrow. The contract will include the...
29.10.2019
Completion
2022
4 Victoria Street
 
Planning permission granted
Planning permission granted for refurbishment and extension of existing building to provide additional B1 (office) floorspace, use of ground floor for retail (Class A1)...
11.09.2019
Kidbrooke Square
 
New release
Update - Launching Saturday 26th November 2022.Coming soon Autumn 2022 - a collection of one and two-bedroom Shared Ownership apartments at Kidbrooke Square.A brand...
05.11.2022
Heron House
 
New images
New photo of Heron House under construction in Wembley HA9.
23.03.2024
East Wick & Sweetwater
 
Coming soon
The first phase at East Wick & Sweetwater is sold out and enabling works have started on phase 2. Register now for the next phase that will bring 210 homes to the...
13.02.2024
Completion
2023
Kings Crescent
Completion
2023
45 Foubert's Place
 
Planning permission granted
Westminster Council approves plans for demolition of the existing fourth-floor roof structures and erection of a two-storey roof extension to create new fourth and fifth...
07.05.2022
Completion
2023
The Lancelot Collection
 
New appointment
Knowles has been appointed as the principal contractor to deliver Phase 1 works at 3-11 Lancelot Place in Knightsbridge. 6 existing houses will be demolished and...
20.03.2022
Residential prices from
£16,150,000
Completion
2024
1-18 York Terrace East
 
Site sold
1-18 York Terrace development site has now been sold, reports Financial Times.
04.09.2022
The Hertford (Park Lane Mews Hotel)
 
New images
New photos of the Park Lane Mews Hotel & Residences development in Mayfair, London W1.
29.04.2024
Completion
2025
27 Savile Row
 
Planning application submitted
Planning application submitted for the demolition of former police station building, excavation to create new basement 2 level and to enlarge existing basement 1 level,...
09.11.2022
Completion
1939
Brook Valley Gardens
 
Sold out
Brook Valley Gardens has been fully sold out.Please contact Countryside Properties if you are interested in purchasing a home in the next phase, which will be available...
03.01.2023
Completion
2025
Argenta House
 
Planning permission granted
Planning permission granted for demolition of the existing two storey building (Use class B1) and redevelopment to Provide a 24-storey building comprising 130...
18.08.2020
TwelveTrees Park
 
New release
The Verdant Collection at TwelveTrees Park is launching soon! Register your interest now with Berkeley. The meaning of the word 'verdant' is covered with healthy...
28.09.2021
Residential prices from
£520,000
Completion
2025